What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Newburn?
In Newburn, a wraparound extension typically costs £2,000–£2,900 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £56,000–£81,000. Prices across the North East are typically 10% below the UK average for this kind of work, which is reflected in the range for Newburn. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £40,000–£58,000 |
| Typical project (28 m²) | £56,000–£81,000 |
| Larger project (39 m²) | £78,000–£113,000 |
| Rate per m² | £2,000–£2,900 |
The biggest cost drivers are:
- Kitchen and flooring specification
- Total footprint and the amount of glazing
- Drainage changes
- Party wall surveyor fees for one or both neighbours
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Newburn?
Before anything is built in Newburn, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Underfloor heating option, electrics and plastering
- Party wall notices and surveyor liaison
- Design and planning application
- Structural engineer’s design for steels and supports
- Building control completion
- Removal of internal and external walls
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Newburn
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Newburn sits in Tyne and Wear, about 5 miles west of Newcastle upon Tyne. We cover the whole of Newburn, including postcodes NE15.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Newburn
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
How long does a wraparound extension take in Newburn?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Newburn?
In Newburn, a wraparound extension typically costs £2,000–£2,900 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £56,000–£81,000. Your fixed price depends on the survey and drawings.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
