What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Newry?
In Newry, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £34,000–£50,000. The guide for Newry reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £24,000–£35,000 |
| Typical project (20 m²) | £34,000–£50,000 |
| Larger project (28 m²) | £47,500–£70,000 |
| Rate per m² | £1,700–£2,500 |
The main things that change the cost:
- Ground conditions and foundation depth
- Kitchen, flooring and finishes, which we can include or leave to you
- How much of the existing house is opened up
- Floor area and the length of new wall
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Newry?
Before anything is built in Newry, we confirm which approvals apply in Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Building control inspections and completion certificate
- Foundations, drainage and any build-over agreement
- Cavity walls, insulation and roof to current building regulations
- Measured survey and design drawings
- Knock-through to the existing house with steel beams
- Structural calculations for steels and lintels
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Newry
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT34 outwards, we take on projects throughout Newry and the surrounding parts of County Down.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Newry
How much does a single-storey extension cost in Newry?
In Newry, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £34,000–£50,000. Your fixed price depends on the survey and drawings.
Do you build single-storey extensions in Newry?
Yes. We build single-storey extensions across Newry, including postcodes BT34 and BT35. Every project starts with a free home visit.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Do I need planning permission for a single-storey extension in Newry?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.