What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Newton Mearns?
In Newton Mearns, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000. Prices in Scotland sit near the national average for this kind of work, and the range for Newton Mearns reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,500–£39,000 |
| Typical project (20 m²) | £38,000–£56,000 |
| Larger project (28 m²) | £53,000–£78,500 |
| Rate per m² | £1,900–£2,800 |
Your quote will depend mainly on:
- Kitchen, flooring and finishes, which we can include or leave to you
- Floor area and the length of new wall
- Ground conditions and foundation depth
- Glazing: sliding and bifold doors cost more than French doors
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Newton Mearns?
Before anything is built in Newton Mearns, we confirm which approvals apply in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical single-storey extension we handle:
- Knock-through to the existing house with steel beams
- Measured survey and design drawings
- Doors, windows and roof glazing installed
- Structural calculations for steels and lintels
- Building control inspections and completion certificate
- Cavity walls, insulation and roof to current building regulations
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Newton Mearns
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
From G77 outwards, we take on projects throughout Newton Mearns and the surrounding parts of Renfrewshire and Inverclyde.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Newton Mearns
Do I need planning permission for a single-storey extension in Newton Mearns?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How long does a single-storey extension take in Newton Mearns?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a single-storey extension cost in Newton Mearns?
In Newton Mearns, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £38,000–£56,000. Your fixed price depends on the survey and drawings.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.