What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Sudbury?
In Sudbury, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £41,000–£61,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Sudbury. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £28,500–£42,500 |
| Typical project (20 m²) | £41,000–£61,000 |
| Larger project (28 m²) | £57,500–£85,500 |
| Rate per m² | £2,050–£3,050 |
Your quote will depend mainly on:
- Roof type and the size of any lantern or roof windows
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- How much of the existing house is opened up
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Sudbury?
Here is how the rules work for a single-storey extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most single-storey extensions:
- Knock-through to the existing house with steel beams
- Structural calculations for steels and lintels
- Foundations, drainage and any build-over agreement
- Cavity walls, insulation and roof to current building regulations
- Doors, windows and roof glazing installed
- Measured survey and design drawings
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Sudbury
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Our Sudbury coverage includes postcode districts CO10, and we also work in nearby places such as Colchester, Haverhill and Braintree.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Sudbury
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How much does a single-storey extension cost in Sudbury?
In Sudbury, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £41,000–£61,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Sudbury?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
