What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Surbiton?
In Surbiton, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £51,000–£75,000. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Surbiton. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £35,500–£52,500 |
| Typical project (20 m²) | £51,000–£75,000 |
| Larger project (28 m²) | £71,500–£105,000 |
| Rate per m² | £2,550–£3,750 |
The biggest cost drivers are:
- Glazing: sliding and bifold doors cost more than French doors
- Floor area and the length of new wall
- Ground conditions and foundation depth
- Roof type and the size of any lantern or roof windows
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a single-storey extension in Surbiton?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a single-storey extension:
- Building control inspections and completion certificate
- Foundations, drainage and any build-over agreement
- First and second fix electrics, heating and plastering
- Structural calculations for steels and lintels
- Measured survey and design drawings
- Cavity walls, insulation and roof to current building regulations
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Surbiton
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Projects in Surbiton (KT5 and KT6) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Surbiton
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Surbiton?
In Surbiton, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £51,000–£75,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Surbiton?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
