SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonSingle-storey extensions

Single-storey extensions in New Malden

SK Developments designs, gets approval for and builds single-storey extensions in New Malden and across Greater London, with one contract from the first drawing to the building control sign-off.

Guide price in New Malden

£2,550–£3,750 per m² of floor area

In New Malden, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £51,000–£75,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a single-storey extension?

Single-storey rear extension with bifold doors open onto a patio and a glass roof lantern

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.

How much does a single-storey extension cost in New Malden?

In New Malden, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £51,000–£75,000. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.

Guide prices for New Malden, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (14 m²)£35,500–£52,500
Typical project (20 m²)£51,000–£75,000
Larger project (28 m²)£71,500–£105,000
Rate per m²£2,550–£3,750

The biggest cost drivers are:

  • Glazing: sliding and bifold doors cost more than French doors
  • Floor area and the length of new wall
  • Kitchen, flooring and finishes, which we can include or leave to you
  • Ground conditions and foundation depth

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a single-storey extension in New Malden?

Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Building control inspections and completion certificate
  • First and second fix electrics, heating and plastering
  • Measured survey and design drawings
  • Doors, windows and roof glazing installed
  • Foundations, drainage and any build-over agreement
  • Structural calculations for steels and lintels

How long does it take?

Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in New Malden

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

From KT3 outwards, we take on projects throughout New Malden and the surrounding parts of Greater London.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about single-storey extensions in New Malden

What is a build-over agreement?

If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.

How much does a single-storey extension cost in New Malden?

In New Malden, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £51,000–£75,000. Your fixed price depends on the survey and drawings.

Do I need planning permission for a single-storey extension?

Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.

Is VAT charged on an extension?

Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.

How long does a single-storey extension take in New Malden?

Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.

Tell us about your project in New Malden and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price