What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Woking?
In Woking, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £44,000–£65,000. Building costs in the South East run about 12% above the UK average, and the figures for Woking are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £31,000–£45,500 |
| Typical project (20 m²) | £44,000–£65,000 |
| Larger project (28 m²) | £61,500–£91,000 |
| Rate per m² | £2,200–£3,250 |
Your quote will depend mainly on:
- Glazing: sliding and bifold doors cost more than French doors
- Roof type and the size of any lantern or roof windows
- Ground conditions and foundation depth
- Floor area and the length of new wall
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Woking?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Foundations, drainage and any build-over agreement
- First and second fix electrics, heating and plastering
- Building control inspections and completion certificate
- Knock-through to the existing house with steel beams
- Measured survey and design drawings
- Structural calculations for steels and lintels
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Woking
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
We work across Woking and neighbouring areas such as Weybridge, Guildford and Egham. Postcodes we cover in Woking include GU22.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Woking
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Woking?
In Woking, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £44,000–£65,000. Your fixed price depends on the survey and drawings.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How long does a single-storey extension take in Woking?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.