What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Worksop?
In Worksop, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £37,000–£55,000. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Worksop. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,000–£38,500 |
| Typical project (20 m²) | £37,000–£55,000 |
| Larger project (28 m²) | £52,000–£77,000 |
| Rate per m² | £1,850–£2,750 |
Your quote will depend mainly on:
- Ground conditions and foundation depth
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- Roof type and the size of any lantern or roof windows
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a single-storey extension in Worksop?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a single-storey extension:
- Knock-through to the existing house with steel beams
- Measured survey and design drawings
- Doors, windows and roof glazing installed
- Building control inspections and completion certificate
- Structural calculations for steels and lintels
- Foundations, drainage and any build-over agreement
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Worksop
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Our Worksop coverage includes postcode districts S80, and we also work in nearby places such as Dinnington, Retford and Staveley.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Worksop
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Who approves a single-storey extension in Worksop?
Planning matters in Worksop go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Worksop?
In Worksop, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £37,000–£55,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.