What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Worksop?
In Worksop, a kitchen extension typically costs £2,150–£3,250 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £47,500–£71,500. Building costs in the East Midlands run about 5% below the UK average, and the figures for Worksop are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £32,000–£49,000 |
| Typical project (22 m²) | £47,500–£71,500 |
| Larger project (31 m²) | £66,500–£101,000 |
| Rate per m² | £2,150–£3,250 |
The biggest cost drivers are:
- Glazing and roof lanterns
- Underfloor heating and flooring
- Kitchen units, worktops and appliances
- Island with sink or hob, which needs services in the floor
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a kitchen extension in Worksop?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a kitchen extension:
- Drainage and water supply positioned for the sink and appliances
- Extraction ducted to outside
- Flooring and decoration
- Building control sign-off
- Electrics, lighting plan and sockets
- Kitchen layout planned alongside the extension design
How long does it take?
Expect 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Worksop
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Worksop sits in Nottinghamshire, about 15 miles east of Sheffield. We cover the whole of Worksop, including postcodes S80.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Worksop
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
Who approves a kitchen extension in Worksop?
Planning matters in Worksop go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
How much does a kitchen extension cost in Worksop?
In Worksop, a kitchen extension typically costs £2,150–£3,250 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £47,500–£71,500. Your fixed price depends on the survey and drawings.