What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Burton upon Trent?
In Burton upon Trent, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Prices in the West Midlands sit near the national average for this kind of work, and the range for Burton upon Trent reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The main things that change the cost:
- Site access and phasing
- Roads, sewers and adoption agreements
- Number and size of homes
- Specification
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Burton upon Trent?
Here is how the rules work for a small housing development in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Handover packs for each home
- External works and landscaping
- Design development and discharge of conditions
- Groundworks, roads and drainage
- House construction to building regulations
- Warranty and building control inspections
How long does it take?
Expect 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Burton upon Trent
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Burton upon Trent sits in Staffordshire, about 11 miles south-west of Derby. We cover the whole of Burton upon Trent, including postcodes DE14.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Burton upon Trent
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How much does a small housing development cost in Burton upon Trent?
In Burton upon Trent, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Who approves a small housing development in Burton upon Trent?
Planning matters in Burton upon Trent go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
