What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Epsom?
In Epsom, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £800,000–£1,200,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £560,000–£840,000 |
| Typical project (400 m²) | £800,000–£1,200,000 |
| Larger project (560 m²) | £1,120,000–£1,680,000 |
| Rate per m² | £2,000–£3,000 |
Your quote will depend mainly on:
- Number and size of homes
- Ground conditions
- Roads, sewers and adoption agreements
- Planning conditions and obligations
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Epsom?
The approval route for Epsom is set by planning law in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a small housing development:
- Pre-construction cost plan
- House construction to building regulations
- Warranty and building control inspections
- Groundworks, roads and drainage
- External works and landscaping
- Handover packs for each home
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Epsom
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Projects in Epsom (KT17 and KT19) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Epsom
How much does a small housing development cost in Epsom?
In Epsom, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £800,000–£1,200,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Do you build small housing developments in Epsom?
Yes. We build small housing developments across Epsom, including postcodes KT17 and KT19. Every project starts with a free home visit.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
