What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Hebburn?
In Hebburn, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £640,000–£980,000. Prices across the North East are typically 10% below the UK average for this kind of work, which is reflected in the range for Hebburn. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £448,000–£686,000 |
| Typical project (400 m²) | £640,000–£980,000 |
| Larger project (560 m²) | £896,000–£1,372,000 |
| Rate per m² | £1,600–£2,450 |
The biggest cost drivers are:
- Specification
- Roads, sewers and adoption agreements
- Number and size of homes
- Planning conditions and obligations
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Hebburn?
Whether you need planning permission depends on your house and its location in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Pre-construction cost plan
- Groundworks, roads and drainage
- External works and landscaping
- Warranty and building control inspections
- House construction to building regulations
- Design development and discharge of conditions
How long does it take?
Allow 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Hebburn
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Hebburn sits in Tyne and Wear, about 4 miles east of Newcastle upon Tyne. We cover the whole of Hebburn, including postcodes NE31.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Hebburn
Who approves a small housing development in Hebburn?
Planning matters in Hebburn go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How much does a small housing development cost in Hebburn?
In Hebburn, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £640,000–£980,000. Your fixed price depends on the survey and drawings.