What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Gateshead?
In Gateshead, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £640,000–£980,000. The guide for Gateshead reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £448,000–£686,000 |
| Typical project (400 m²) | £640,000–£980,000 |
| Larger project (560 m²) | £896,000–£1,372,000 |
| Rate per m² | £1,600–£2,450 |
What moves the price most:
- Site access and phasing
- Planning conditions and obligations
- Specification
- Ground conditions
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Gateshead?
The approval route for Gateshead is set by planning law in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most small housing developments:
- External works and landscaping
- Design development and discharge of conditions
- House construction to building regulations
- Utility connections
- Warranty and building control inspections
- Groundworks, roads and drainage
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Gateshead
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Gateshead sits in Tyne and Wear. We cover the whole of Gateshead, including postcodes DH98, NE8, NE82 and NE83.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Gateshead
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Gateshead?
In Gateshead, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £640,000–£980,000. Your fixed price depends on the survey and drawings.
Do you build small housing developments in Gateshead?
Yes. We build small housing developments across Gateshead, including postcodes DH98, NE8, NE82 and NE83. Every project starts with a free home visit.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
