What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Newtownards?
In Newtownards, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £620,000–£920,000. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £434,000–£644,000 |
| Typical project (400 m²) | £620,000–£920,000 |
| Larger project (560 m²) | £868,000–£1,288,000 |
| Rate per m² | £1,550–£2,300 |
The main things that change the cost:
- Specification
- Planning conditions and obligations
- Roads, sewers and adoption agreements
- Ground conditions
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Newtownards?
Before anything is built in Newtownards, we confirm which approvals apply in Northern Ireland. In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Utility connections
- Groundworks, roads and drainage
- Warranty and building control inspections
- External works and landscaping
- Pre-construction cost plan
- House construction to building regulations
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Newtownards
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT22 outwards, we take on projects throughout Newtownards and the surrounding parts of County Down.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Newtownards
Do I need planning permission for a small housing development in Newtownards?
In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Who approves a small housing development in Newtownards?
Planning matters in Newtownards go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Newtownards?
In Newtownards, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £620,000–£920,000. Your fixed price depends on the survey and drawings.