What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Northumberland?
In Northumberland, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £640,000–£980,000. The guide for Northumberland reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £448,000–£686,000 |
| Typical project (400 m²) | £640,000–£980,000 |
| Larger project (560 m²) | £896,000–£1,372,000 |
| Rate per m² | £1,600–£2,450 |
Your quote will depend mainly on:
- Ground conditions
- Roads, sewers and adoption agreements
- Planning conditions and obligations
- Specification
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Northumberland?
Approvals for a small housing development in Northumberland follow the rules for England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- House construction to building regulations
- Utility connections
- Warranty and building control inspections
- Pre-construction cost plan
- Handover packs for each home
- Design development and discharge of conditions
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Northumberland
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Towns we cover in Northumberland include Blyth, Cramlington, Ashington and Bedlington.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Northumberland
How much does a small housing development cost in Northumberland?
In Northumberland, a small housing development typically costs £1,600–£2,450 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £640,000–£980,000. Your fixed price depends on the survey and drawings.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Who approves a small housing development in Northumberland?
Planning matters in Northumberland go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.