What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Redditch?
In Redditch, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Building costs in the West Midlands are close to the UK average, so the figures for Redditch are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The main things that change the cost:
- Site access and phasing
- Planning conditions and obligations
- Ground conditions
- Specification
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Redditch?
Approvals for a small housing development in Redditch follow the rules for England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- Utility connections
- House construction to building regulations
- External works and landscaping
- Warranty and building control inspections
- Groundworks, roads and drainage
- Pre-construction cost plan
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Redditch
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
From B97 outwards, we take on projects throughout Redditch and the surrounding parts of Worcestershire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Redditch
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Redditch?
In Redditch, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
How long does a small housing development take in Redditch?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.