What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Salford?
In Salford, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £680,000–£1,020,000. We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £476,000–£714,000 |
| Typical project (400 m²) | £680,000–£1,020,000 |
| Larger project (560 m²) | £952,000–£1,428,000 |
| Rate per m² | £1,700–£2,550 |
The main things that change the cost:
- Roads, sewers and adoption agreements
- Number and size of homes
- Planning conditions and obligations
- Ground conditions
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Salford?
The approval route for Salford is set by planning law in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most small housing developments:
- Design development and discharge of conditions
- Handover packs for each home
- Warranty and building control inspections
- Pre-construction cost plan
- External works and landscaping
- Utility connections
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Salford
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
From M5 outwards, we take on projects throughout Salford and the surrounding parts of Greater Manchester.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Salford
How much does a small housing development cost in Salford?
In Salford, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £680,000–£1,020,000. Your fixed price depends on the survey and drawings.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Who approves a small housing development in Salford?
Planning matters in Salford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.