What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Tottenham?
In Tottenham, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £940,000–£1,400,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £658,000–£980,000 |
| Typical project (400 m²) | £940,000–£1,400,000 |
| Larger project (560 m²) | £1,316,000–£1,960,000 |
| Rate per m² | £2,350–£3,500 |
The biggest cost drivers are:
- Ground conditions
- Number and size of homes
- Planning conditions and obligations
- Roads, sewers and adoption agreements
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Tottenham?
Before anything is built in Tottenham, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a small housing development:
- Warranty and building control inspections
- Pre-construction cost plan
- Utility connections
- External works and landscaping
- Groundworks, roads and drainage
- Design development and discharge of conditions
How long does it take?
Allow 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Tottenham
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
If your home is in Tottenham or close by in Wood Green, Walthamstow and Southgate, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Tottenham
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Tottenham?
In Tottenham, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £940,000–£1,400,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How long does a small housing development take in Tottenham?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.