SK Developments Free home visit0800 088 6248 Get a quote

EssexStructural alterations and knock-throughs

Structural alterations and knock-throughs in Braintree

Looking for a builder for a structural alteration in Braintree? We design and build structural alterations across Essex, covering postcodes such as CM7 and CM77.

Guide price in Braintree

£4,750–£10,000 for a typical knock-through with steel beam

In Braintree, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Braintree?

In Braintree, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Braintree. Design, structural calculations and council fees are extra.

Guide prices for Braintree, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£4,750–£10,000
Higher specification£10,000–£12,500

The main things that change the cost:

  • What sits above the wall
  • Flush or downstand beam
  • Span of the opening
  • Moving radiators, sockets and pipes

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a structural alteration in Braintree?

The approval route for Braintree is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

On a typical structural alteration we handle:

  • Structural engineer’s calculations and drawings
  • Making good, plastering and flooring repairs
  • Steel beam supply and installation on padstones
  • Party wall notices where needed
  • Building control application
  • Fire protection to the steel

How long does it take?

Allow 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Braintree

Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.

We work across Braintree and neighbouring areas such as Witham, Chelmsford and Maldon. Postcodes we cover in Braintree include CM7 and CM77.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about structural alterations in Braintree

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

How long does a knock-through take?

Usually 1 to 2 weeks on site, plus a few days for plastering to dry.

Who approves a structural alteration in Braintree?

Planning matters in Braintree go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How much does a structural alteration cost in Braintree?

In Braintree, a structural alteration typically costs £4,750–£10,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Braintree.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price