SK Developments Free home visit0800 088 6248 Get a quote

Northern IrelandStructural alterations and knock-throughs

Structural alterations and knock-throughs in County Down

Planning a structural alteration in County Down? We survey, design, handle planning or permitted development checks and build, with building control sign-off at the end.

Guide price in County Down

£3,750–£8,250 for a typical knock-through with steel beam

In County Down, a structural alteration typically costs £3,750–£8,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in County Down?

In County Down, a structural alteration typically costs £3,750–£8,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). The guide for County Down reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for County Down, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£3,750–£8,250
Higher specification£8,250–£10,500

What moves the price most:

  • Floor and ceiling repairs
  • What sits above the wall
  • Moving radiators, sockets and pipes
  • Span of the opening

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a structural alteration in County Down?

Before anything is built in County Down, we confirm which approvals apply in Northern Ireland. In Northern Ireland removing a load-bearing wall needs building control approval from the council.

Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

The work we manage on a structural alteration:

  • Building control application
  • Written agreement with neighbours on shared walls
  • Temporary propping
  • Building control sign-off
  • Steel beam supply and installation on padstones
  • Fire protection to the steel

How long does it take?

Build time is typically 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in County Down

Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.

Towns we cover in County Down include Bangor, Newtownards, Newry, Banbridge and Downpatrick.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about structural alterations in County Down

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

Do I need planning permission for a structural alteration in County Down?

In Northern Ireland removing a load-bearing wall needs building control approval from the council.

How long does a structural alteration take in County Down?

Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.

Can the beam be hidden?

Often, by setting it within the ceiling depth. It depends on the joists and span.

How do I know if a wall is load-bearing?

Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.

How much does a structural alteration cost in County Down?

In County Down, a structural alteration typically costs £3,750–£8,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in County Down.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price