SK Developments Free home visit0800 088 6248 Get a quote

KentStructural alterations and knock-throughs

Structural alterations and knock-throughs in Deal

SK Developments designs, gets approval for and builds structural alterations in Deal and across Kent, with one contract from the first drawing to the building control sign-off.

Guide price in Deal

£5,000–£10,500 for a typical knock-through with steel beam

In Deal, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Deal?

In Deal, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). The guide for Deal reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Deal, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,000–£10,500
Higher specification£10,500–£13,000

The main things that change the cost:

  • What sits above the wall
  • Flush or downstand beam
  • Party wall involvement
  • Floor and ceiling repairs

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a structural alteration in Deal?

The approval route for Deal is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Building control sign-off
  • Party wall notices where needed
  • Steel beam supply and installation on padstones
  • Structural engineer’s calculations and drawings
  • Building control application
  • Making good, plastering and flooring repairs

How long does it take?

Allow 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Deal

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

From CT14 outwards, we take on projects throughout Deal and the surrounding parts of Kent.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about structural alterations in Deal

Who approves a structural alteration in Deal?

Planning matters in Deal go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Can the beam be hidden?

Often, by setting it within the ceiling depth. It depends on the joists and span.

How long does a knock-through take?

Usually 1 to 2 weeks on site, plus a few days for plastering to dry.

How much does a structural alteration cost in Deal?

In Deal, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Do I need a party wall notice?

In England and Wales, if the beam sits in a party wall, yes.

Tell us about your project in Deal and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price