What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Frome?
In Frome, a structural alteration typically costs £4,500–£9,750 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices in the South West sit near the national average for this kind of work, and the range for Frome reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,500–£9,750 |
| Higher specification | £9,750–£12,000 |
The main things that change the cost:
- Flush or downstand beam
- What sits above the wall
- Party wall involvement
- Span of the opening
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Frome?
Approvals for a structural alteration in Frome follow the rules for England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a structural alteration:
- Steel beam supply and installation on padstones
- Party wall notices where needed
- Structural engineer’s calculations and drawings
- Making good, plastering and flooring repairs
- Building control sign-off
- Building control application
How long does it take?
The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Frome
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Our Frome coverage includes postcode districts BA11, and we also work in nearby places such as Trowbridge, Bath and Melksham.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about structural alterations in Frome
How long does a structural alteration take in Frome?
Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.
How much does a structural alteration cost in Frome?
In Frome, a structural alteration typically costs £4,500–£9,750 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Do I need building regulations approval?
Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.