What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Golders Green?
In Golders Green, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,750–£12,500 |
| Higher specification | £12,500–£15,500 |
What moves the price most:
- Moving radiators, sockets and pipes
- Floor and ceiling repairs
- Party wall involvement
- Flush or downstand beam
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a structural alteration in Golders Green?
Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Steel beam supply and installation on padstones
- Structural engineer’s calculations and drawings
- Building control application
- Party wall notices where needed
- Fire protection to the steel
- Making good, plastering and flooring repairs
How long does it take?
Allow 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Golders Green
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Our Golders Green coverage includes postcode districts NW11, and we also work in nearby places such as Hampstead, Finchley and Hendon.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Golders Green
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.
How much does a structural alteration cost in Golders Green?
In Golders Green, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
Who approves a structural alteration in Golders Green?
Planning matters in Golders Green go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.