Greater LondonStructural alterations and knock-throughs

Structural alterations and knock-throughs in Wembley

SK Developments builds structural alterations in Wembley, about 8 miles north-west of central London. We look after the design, the planning or permitted development check, building control and the build itself.

Guide price in Wembley

£5,750–£12,500 for a typical knock-through with steel beam

In Wembley, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Wembley?

In Wembley, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.

Guide prices for Wembley, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,750–£12,500
Higher specification£12,500–£15,500

The main things that change the cost:

  • Party wall involvement
  • Floor and ceiling repairs
  • What sits above the wall
  • Span of the opening

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a structural alteration in Wembley?

The approval route for Wembley is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

The work we manage on a structural alteration:

  • Structural engineer’s calculations and drawings
  • Steel beam supply and installation on padstones
  • Building control sign-off
  • Fire protection to the steel
  • Party wall notices where needed
  • Building control application

How long does it take?

Allow 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Wembley

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

Our Wembley coverage includes postcode districts HA0, and we also work in nearby places such as Harrow, Greenford and Willesden.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about structural alterations in Wembley

How long does a knock-through take?

Usually 1 to 2 weeks on site, plus a few days for plastering to dry.

Who approves a structural alteration in Wembley?

Planning matters in Wembley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How much does a structural alteration cost in Wembley?

In Wembley, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

How do I know if a wall is load-bearing?

Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.