What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Wembley?
In Wembley, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,750–£12,500 |
| Higher specification | £12,500–£15,500 |
The main things that change the cost:
- Party wall involvement
- Floor and ceiling repairs
- What sits above the wall
- Span of the opening
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a structural alteration in Wembley?
The approval route for Wembley is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a structural alteration:
- Structural engineer’s calculations and drawings
- Steel beam supply and installation on padstones
- Building control sign-off
- Fire protection to the steel
- Party wall notices where needed
- Building control application
How long does it take?
Allow 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Wembley
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Our Wembley coverage includes postcode districts HA0, and we also work in nearby places such as Harrow, Greenford and Willesden.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about structural alterations in Wembley
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Who approves a structural alteration in Wembley?
Planning matters in Wembley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
How much does a structural alteration cost in Wembley?
In Wembley, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.