What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Barrow in Furness?
In Barrow in Furness, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £57,500–£84,000. That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £41,000–£60,000 |
| Typical project (28 m²) | £57,500–£84,000 |
| Larger project (39 m²) | £80,000–£117,000 |
| Rate per m² | £2,050–£3,000 |
What moves the price most:
- Steelwork and propping of the existing house
- Kitchen and flooring specification
- Access for materials on terraced streets
- Drainage changes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Barrow in Furness?
Before anything is built in Barrow in Furness, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical wraparound extension we handle:
- Party wall notices and surveyor liaison
- Building control completion
- Walls, roof and glazing
- Foundations and drainage
- Underfloor heating option, electrics and plastering
- Structural engineer’s design for steels and supports
How long does it take?
Build time is typically 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Barrow in Furness
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Barrow in Furness sits in Cumbria, about 32 miles north-west of Preston. We cover the whole of Barrow in Furness, including postcodes LA14.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Barrow in Furness
How much does a wraparound extension cost in Barrow in Furness?
In Barrow in Furness, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £57,500–£84,000. Your fixed price depends on the survey and drawings.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Do you build wraparound extensions in Barrow in Furness?
Yes. We build wraparound extensions across Barrow in Furness, including postcodes LA14. Every project starts with a free home visit.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.