What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Gloucestershire?
In Gloucestershire, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £63,000–£91,000. Building costs in the South West are close to the UK average, so the figures for Gloucestershire are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £45,000–£65,000 |
| Typical project (28 m²) | £63,000–£91,000 |
| Larger project (39 m²) | £88,000–£127,000 |
| Rate per m² | £2,250–£3,250 |
The main things that change the cost:
- Kitchen and flooring specification
- Party wall surveyor fees for one or both neighbours
- Total footprint and the amount of glazing
- Drainage changes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a wraparound extension in Gloucestershire?
The approval route for Gloucestershire is set by planning law in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most wraparound extensions:
- Structural engineer’s design for steels and supports
- Removal of internal and external walls
- Building control completion
- Underfloor heating option, electrics and plastering
- Party wall notices and surveyor liaison
- Walls, roof and glazing
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Gloucestershire
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Towns we cover in Gloucestershire include Gloucester, Cheltenham, Stroud, Kingswood, Mangotsfield and Yate.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Gloucestershire
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
How much does a wraparound extension cost in Gloucestershire?
In Gloucestershire, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £63,000–£91,000. Your fixed price depends on the survey and drawings.
Who approves a wraparound extension in Gloucestershire?
Planning matters in Gloucestershire go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.