Wraparound extensions in Hastings

SK Developments builds wraparound extensions in Hastings, about 32 miles east of Brighton. We look after the design, the planning or permitted development check, building control and the build itself.

Guide price in Hastings

£2,450–£3,600 per m² of floor area

In Hastings, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in Hastings?

In Hastings, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.

Guide prices for Hastings, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£49,000–£72,000
Typical project (28 m²)£68,500–£101,000
Larger project (39 m²)£95,500–£140,500
Rate per m²£2,450–£3,600

What moves the price most:

  • Kitchen and flooring specification
  • Party wall surveyor fees for one or both neighbours
  • Drainage changes
  • Steelwork and propping of the existing house

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a wraparound extension in Hastings?

Approvals for a wraparound extension in Hastings follow the rules for England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a wraparound extension:

  • Underfloor heating option, electrics and plastering
  • Party wall notices and surveyor liaison
  • Structural engineer’s design for steels and supports
  • Building control completion
  • Removal of internal and external walls
  • Foundations and drainage

How long does it take?

The build itself usually takes 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in Hastings

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

Our Hastings coverage includes postcode districts TN34, and we also work in nearby places such as Bexhill-on-Sea, Hailsham and Eastbourne.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about wraparound extensions in Hastings

What about the old back addition?

The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.

Who approves a wraparound extension in Hastings?

Planning matters in Hastings go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How long does it take to build?

Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.

How much does a wraparound extension cost in Hastings?

In Hastings, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.

Can we keep a separate living room?

Yes. Many clients keep the front room separate and open up only the back of the house.

Tell us about your project in Hastings and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.