What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in East Sussex?
In East Sussex, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. Building costs in the South East run about 12% above the UK average, and the figures for East Sussex are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £49,000–£72,000 |
| Typical project (28 m²) | £68,500–£101,000 |
| Larger project (39 m²) | £95,500–£140,500 |
| Rate per m² | £2,450–£3,600 |
Your quote will depend mainly on:
- Kitchen and flooring specification
- Total footprint and the amount of glazing
- Party wall surveyor fees for one or both neighbours
- Steelwork and propping of the existing house
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a wraparound extension in East Sussex?
Before anything is built in East Sussex, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a wraparound extension:
- Party wall notices and surveyor liaison
- Underfloor heating option, electrics and plastering
- Structural engineer’s design for steels and supports
- Removal of internal and external walls
- Design and planning application
- Foundations and drainage
How long does it take?
Allow 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in East Sussex
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Towns we cover in East Sussex include Brighton, Eastbourne, Hastings, Hove, Bexhill-on-Sea and Hailsham.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in East Sussex
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
How much does a wraparound extension cost in East Sussex?
In East Sussex, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
Do you build wraparound extensions in East Sussex?
Yes. We build wraparound extensions across East Sussex, including postcodes BN1, BN10, BN2, BN20 and BN21. Every project starts with a free home visit.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.