SK Developments Free home visit0800 088 6248 Get a quote

West MidlandsWraparound extensions

Wraparound extensions in Kingswinford

A wraparound extension in Kingswinford starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in Kingswinford

£2,150–£3,100 per m² of floor area

In Kingswinford, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in Kingswinford?

In Kingswinford, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Prices in the West Midlands sit near the national average for this kind of work, and the range for Kingswinford reflects that. Design, structural calculations and council fees are extra.

Guide prices for Kingswinford, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£43,000–£62,000
Typical project (28 m²)£60,000–£87,000
Larger project (39 m²)£84,000–£121,000
Rate per m²£2,150–£3,100

The biggest cost drivers are:

  • Drainage changes
  • Party wall surveyor fees for one or both neighbours
  • Total footprint and the amount of glazing
  • Steelwork and propping of the existing house

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a wraparound extension in Kingswinford?

Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

Handled as part of most wraparound extensions:

  • Underfloor heating option, electrics and plastering
  • Removal of internal and external walls
  • Walls, roof and glazing
  • Design and planning application
  • Building control completion
  • Structural engineer’s design for steels and supports

How long does it take?

Allow 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in Kingswinford

The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.

Projects in Kingswinford (DY6) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about wraparound extensions in Kingswinford

How much does a wraparound extension cost in Kingswinford?

In Kingswinford, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.

Can we keep a separate living room?

Yes. Many clients keep the front room separate and open up only the back of the house.

Does a wraparound extension need planning permission?

Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.

What about the old back addition?

The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.

Do you build wraparound extensions in Kingswinford?

Yes. We build wraparound extensions across Kingswinford, including postcodes DY6. Every project starts with a free home visit.

Start with a guide price, then book a free survey for a fixed quote in Kingswinford.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price