Wraparound extensions in the West Midlands

We take on wraparound extensions throughout the West Midlands, including Birmingham, Coventry and Wolverhampton, with a free home visit and a fixed quote for the agreed specification.

Guide price in the West Midlands

£2,150–£3,100 per m² of floor area

In the West Midlands, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in the West Midlands?

In the West Midlands, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Building costs in the West Midlands are close to the UK average, so the figures for the West Midlands are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for the West Midlands, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£43,000–£62,000
Typical project (28 m²)£60,000–£87,000
Larger project (39 m²)£84,000–£121,000
Rate per m²£2,150–£3,100

The biggest cost drivers are:

  • Party wall surveyor fees for one or both neighbours
  • Total footprint and the amount of glazing
  • Access for materials on terraced streets
  • Steelwork and propping of the existing house

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a wraparound extension in the West Midlands?

Here is how the rules work for a wraparound extension in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

What we take care of:

  • Party wall notices and surveyor liaison
  • Walls, roof and glazing
  • Removal of internal and external walls
  • Foundations and drainage
  • Structural engineer’s design for steels and supports
  • Underfloor heating option, electrics and plastering

How long does it take?

Allow 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in the West Midlands

Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.

Towns we cover in the West Midlands include Birmingham, Coventry, Wolverhampton, Dudley, Walsall and Solihull.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about wraparound extensions in the West Midlands

Is a wraparound worth it?

It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.

Does a wraparound extension need planning permission?

Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.

Can we keep a separate living room?

Yes. Many clients keep the front room separate and open up only the back of the house.

How much does a wraparound extension cost in the West Midlands?

In the West Midlands, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.

How long does a wraparound extension take in the West Midlands?

Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.

Start with a guide price, then book a free survey for a fixed quote in the West Midlands.