What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Lerwick?
In Lerwick, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £43,000–£62,000 |
| Typical project (28 m²) | £60,000–£87,000 |
| Larger project (39 m²) | £84,000–£121,000 |
| Rate per m² | £2,150–£3,100 |
The main things that change the cost:
- Steelwork and propping of the existing house
- Kitchen and flooring specification
- Access for materials on terraced streets
- Agreements with neighbours on shared walls
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Lerwick?
Before anything is built in Lerwick, we confirm which approvals apply in Scotland. In Scotland a wraparound extension normally needs planning permission and a building warrant.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Structural engineer’s design for steels and supports
- Written agreement with neighbours on shared walls
- Building control completion
- Foundations and drainage
- Removal of internal and external walls
- Walls, roof and glazing
How long does it take?
Build time is typically 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Lerwick
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Lerwick are taken on by arrangement. We confirm availability first, and shipping, travel and accommodation costs are shown separately in the quote.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in Lerwick
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How much does a wraparound extension cost in Lerwick?
In Lerwick, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
Do I need planning permission for a wraparound extension in Lerwick?
In Scotland a wraparound extension normally needs planning permission and a building warrant.
How long does a wraparound extension take in Lerwick?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.