What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in New Malden?
In New Malden, a wraparound extension typically costs £2,850–£4,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £80,000–£116,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £57,000–£83,000 |
| Typical project (28 m²) | £80,000–£116,000 |
| Larger project (39 m²) | £111,000–£162,000 |
| Rate per m² | £2,850–£4,150 |
The biggest cost drivers are:
- Kitchen and flooring specification
- Drainage changes
- Total footprint and the amount of glazing
- Access for materials on terraced streets
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a wraparound extension in New Malden?
Before anything is built in New Malden, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a wraparound extension:
- Foundations and drainage
- Structural engineer’s design for steels and supports
- Party wall notices and surveyor liaison
- Walls, roof and glazing
- Building control completion
- Design and planning application
How long does it take?
Expect 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in New Malden
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Our New Malden coverage includes postcode districts KT3, and we also work in nearby places such as Surbiton, Morden and Wimbledon.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in New Malden
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
How much does a wraparound extension cost in New Malden?
In New Malden, a wraparound extension typically costs £2,850–£4,150 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £80,000–£116,000. Your fixed price depends on the survey and drawings.
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How long does a wraparound extension take in New Malden?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
