What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Oban?
In Oban, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £43,000–£62,000 |
| Typical project (28 m²) | £60,000–£87,000 |
| Larger project (39 m²) | £84,000–£121,000 |
| Rate per m² | £2,150–£3,100 |
What moves the price most:
- Total footprint and the amount of glazing
- Kitchen and flooring specification
- Agreements with neighbours on shared walls
- Steelwork and propping of the existing house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Oban?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland a wraparound extension normally needs planning permission and a building warrant.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Design and planning application
- Written agreement with neighbours on shared walls
- Underfloor heating option, electrics and plastering
- Foundations and drainage
- Walls, roof and glazing
- Removal of internal and external walls
How long does it take?
Build time is typically 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Oban
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Oban are taken on by arrangement. We confirm availability first, and any travel or accommodation costs are shown separately in the quote.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Oban
Do I need planning permission for a wraparound extension in Oban?
In Scotland a wraparound extension normally needs planning permission and a building warrant.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Oban?
In Oban, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.
How long does a wraparound extension take in Oban?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.