What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Oban?
In Oban, a kitchen extension typically costs £2,200–£3,300 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £48,500–£72,500. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £33,000–£49,500 |
| Typical project (22 m²) | £48,500–£72,500 |
| Larger project (31 m²) | £68,000–£102,500 |
| Rate per m² | £2,200–£3,300 |
The main things that change the cost:
- Kitchen units, worktops and appliances
- Island with sink or hob, which needs services in the floor
- Extension size and roof design
- Glazing and roof lanterns
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a kitchen extension in Oban?
Approvals for a kitchen extension in Oban follow the rules for Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical kitchen extension we handle:
- Kitchen layout planned alongside the extension design
- Extraction ducted to outside
- Drainage and water supply positioned for the sink and appliances
- Flooring and decoration
- Extension structure, roof and glazing
- Building control sign-off
How long does it take?
Build time is typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Oban
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Because Oban is a long way from the main centres, we confirm availability before quoting and list any travel costs separately.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about kitchen extensions in Oban
How much does a kitchen extension cost in Oban?
In Oban, a kitchen extension typically costs £2,200–£3,300 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £48,500–£72,500. Your fixed price depends on the survey and drawings.
Who approves a kitchen extension in Oban?
Planning matters in Oban go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Do I need planning permission for a kitchen extension in Oban?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.