What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Salisbury?
In Salisbury, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £63,000–£91,000. Prices in the South West sit near the national average for this kind of work, and the range for Salisbury reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £45,000–£65,000 |
| Typical project (28 m²) | £63,000–£91,000 |
| Larger project (39 m²) | £88,000–£127,000 |
| Rate per m² | £2,250–£3,250 |
What moves the price most:
- Total footprint and the amount of glazing
- Steelwork and propping of the existing house
- Party wall surveyor fees for one or both neighbours
- Drainage changes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a wraparound extension in Salisbury?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Party wall notices and surveyor liaison
- Underfloor heating option, electrics and plastering
- Foundations and drainage
- Design and planning application
- Walls, roof and glazing
- Structural engineer’s design for steels and supports
How long does it take?
Expect 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Salisbury
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Salisbury sits in Wiltshire, about 20 miles north-west of Southampton. We cover the whole of Salisbury, including postcodes SP1.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Salisbury
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
How long does a wraparound extension take in Salisbury?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a wraparound extension cost in Salisbury?
In Salisbury, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £63,000–£91,000. Your fixed price depends on the survey and drawings.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.