What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Skegness?
In Skegness, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £59,000–£85,500. The guide for Skegness reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £42,000–£61,000 |
| Typical project (28 m²) | £59,000–£85,500 |
| Larger project (39 m²) | £82,000–£119,000 |
| Rate per m² | £2,100–£3,050 |
The biggest cost drivers are:
- Total footprint and the amount of glazing
- Drainage changes
- Steelwork and propping of the existing house
- Party wall surveyor fees for one or both neighbours
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Skegness?
Here is how the rules work for a wraparound extension in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical wraparound extension we handle:
- Building control completion
- Structural engineer’s design for steels and supports
- Underfloor heating option, electrics and plastering
- Foundations and drainage
- Removal of internal and external walls
- Walls, roof and glazing
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Skegness
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Our Skegness coverage includes postcode districts PE25, and we also work in nearby places such as Boston, King's Lynn and Spalding.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in Skegness
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Skegness?
In Skegness, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £59,000–£85,500. Your fixed price depends on the survey and drawings.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
How long does a wraparound extension take in Skegness?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.