What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Stanley?
In Stanley, a wraparound extension typically costs £2,000–£2,900 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £56,000–£81,000. That range is adjusted for the North East, where domestic building work typically costs around 10% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £40,000–£58,000 |
| Typical project (28 m²) | £56,000–£81,000 |
| Larger project (39 m²) | £78,000–£113,000 |
| Rate per m² | £2,000–£2,900 |
Your quote will depend mainly on:
- Kitchen and flooring specification
- Party wall surveyor fees for one or both neighbours
- Steelwork and propping of the existing house
- Drainage changes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a wraparound extension in Stanley?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical wraparound extension we handle:
- Removal of internal and external walls
- Foundations and drainage
- Structural engineer’s design for steels and supports
- Design and planning application
- Building control completion
- Underfloor heating option, electrics and plastering
How long does it take?
Build time is typically 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Stanley
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
If your home is in Stanley or close by in Chester-le-Street, Consett and Gateshead, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Stanley
How long does a wraparound extension take in Stanley?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a wraparound extension cost in Stanley?
In Stanley, a wraparound extension typically costs £2,000–£2,900 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £56,000–£81,000. Your fixed price depends on the survey and drawings.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.