What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Stourport-on-Severn?
In Stourport-on-Severn, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Building costs in the West Midlands are close to the UK average, so the figures for Stourport-on-Severn are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £43,000–£62,000 |
| Typical project (28 m²) | £60,000–£87,000 |
| Larger project (39 m²) | £84,000–£121,000 |
| Rate per m² | £2,150–£3,100 |
What moves the price most:
- Steelwork and propping of the existing house
- Drainage changes
- Kitchen and flooring specification
- Total footprint and the amount of glazing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Stourport-on-Severn?
Approvals for a wraparound extension in Stourport-on-Severn follow the rules for England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a wraparound extension:
- Removal of internal and external walls
- Building control completion
- Walls, roof and glazing
- Underfloor heating option, electrics and plastering
- Design and planning application
- Party wall notices and surveyor liaison
How long does it take?
Build time is typically 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Stourport-on-Severn
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
If your home is in Stourport-on-Severn or close by in Kidderminster, Droitwich and Bromsgrove, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Stourport-on-Severn
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
Who approves a wraparound extension in Stourport-on-Severn?
Planning matters in Stourport-on-Severn go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a wraparound extension cost in Stourport-on-Severn?
In Stourport-on-Severn, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.