What is a barn conversion?

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.
How much does a barn conversion cost in Dungannon?
In Dungannon, a barn conversion typically costs £1,550–£2,600 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £232,500–£390,000. That range is adjusted for Northern Ireland, where domestic building work typically costs around 14% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £163,000–£273,000 |
| Typical project (150 m²) | £232,500–£390,000 |
| Larger project (210 m²) | £325,500–£546,000 |
| Rate per m² | £1,550–£2,600 |
What moves the price most:
- Insulation approach
- Planning conditions and ecology
- Condition of the existing structure
- Glazing and finishes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a barn conversion in Dungannon?
The approval route for Dungannon is set by planning law in Northern Ireland. In Northern Ireland a barn conversion needs planning permission; planning policy supports reusing suitable rural buildings.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most barn conversions:
- Ecology and bat survey coordination
- Structural repairs and new floor slab
- Building control completion
- Structural survey and feasibility
- Planning or prior approval application
- Services, drainage and septic or treatment plant
How long does it take?
Allow 6 to 12 months on site depending on condition. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Dungannon
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
From BT70 outwards, we take on projects throughout Dungannon and the surrounding parts of County Tyrone.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about barn conversions in Dungannon
Do I need planning permission for a barn conversion in Dungannon?
In Northern Ireland a barn conversion needs planning permission; planning policy supports reusing suitable rural buildings.
Do I need a bat survey?
Very often. Barns are common bat roosts, and planning authorities usually ask for an ecology survey.
What about drainage without mains sewer?
A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.
How much does a barn conversion cost in Dungannon?
In Dungannon, a barn conversion typically costs £1,550–£2,600 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £232,500–£390,000. Your fixed price depends on the survey and drawings.
Is VAT reduced on a barn conversion?
Usually yes. Converting a non-residential building into a dwelling normally qualifies for the reduced 5% VAT rate on building work. Our guide prices assume this rate.
How long does a barn conversion take in Dungannon?
Typically 6 to 12 months on site depending on condition. Design and approvals beforehand usually take 4 to 9 months.