SK Developments Free home visit0800 088 6248 Get a quote

Northern IrelandBarn conversions

Barn conversions in County Tyrone

Planning a barn conversion in County Tyrone? We survey, design, handle planning or permitted development checks and build, with building control sign-off at the end.

Guide price in County Tyrone

£1,550–£2,600 per m² of floor area

In County Tyrone, a barn conversion typically costs £1,550–£2,600 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £232,500–£390,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a barn conversion?

Converted red-brick barn with a full-height glazed opening and gravel courtyard at sunset

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.

How much does a barn conversion cost in County Tyrone?

In County Tyrone, a barn conversion typically costs £1,550–£2,600 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £232,500–£390,000. That range is adjusted for Northern Ireland, where domestic building work typically costs around 14% below the national average. Design, structural calculations and council fees are extra.

Guide prices for County Tyrone, including VAT at usually 5% (reduced rate for creating a new dwelling)
Size or typeGuide range
Smaller project (105 m²)£163,000–£273,000
Typical project (150 m²)£232,500–£390,000
Larger project (210 m²)£325,500–£546,000
Rate per m²£1,550–£2,600

The biggest cost drivers are:

  • Access to the site
  • Services and drainage
  • Condition of the existing structure
  • Planning conditions and ecology

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a barn conversion in County Tyrone?

Whether you need planning permission depends on your house and its location in Northern Ireland. In Northern Ireland a barn conversion needs planning permission; planning policy supports reusing suitable rural buildings.

In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most barn conversions:

  • Structural repairs and new floor slab
  • Services, drainage and septic or treatment plant
  • Building control completion
  • New roof covering where needed
  • Ecology and bat survey coordination
  • Planning or prior approval application

How long does it take?

Allow 6 to 12 months on site depending on condition. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in County Tyrone

Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.

Towns we cover in County Tyrone include Omagh, Strabane, Dungannon and Cookstown.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about barn conversions in County Tyrone

Is VAT reduced on a barn conversion?

Usually yes. Converting a non-residential building into a dwelling normally qualifies for the reduced 5% VAT rate on building work. Our guide prices assume this rate.

How long does a barn conversion take in County Tyrone?

Typically 6 to 12 months on site depending on condition. Design and approvals beforehand usually take 4 to 9 months.

Can I get a mortgage for a barn conversion?

Specialist self-build and conversion mortgages release money in stages. We can provide the staged costings lenders ask for.

Do I need planning permission for a barn conversion in County Tyrone?

In Northern Ireland a barn conversion needs planning permission; planning policy supports reusing suitable rural buildings.

How much does a barn conversion cost in County Tyrone?

In County Tyrone, a barn conversion typically costs £1,550–£2,600 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £232,500–£390,000. Your fixed price depends on the survey and drawings.

What about drainage without mains sewer?

A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.

Tell us about your project in County Tyrone and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price