SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonBasement conversions

Basement conversions in Bermondsey

SK Developments designs, gets approval for and builds basement conversions in Bermondsey and across Greater London, with one contract from the first drawing to the building control sign-off.

Guide price in Bermondsey

£2,450–£4,150 per m² for converting an existing cellar

In Bermondsey, a basement conversion typically costs £2,450–£4,150 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £73,500–£124,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a basement conversion?

Basement family room with a glass-walled lightwell bringing daylight down

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.

How much does a basement conversion cost in Bermondsey?

In Bermondsey, a basement conversion typically costs £2,450–£4,150 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £73,500–£124,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Bermondsey. Design, structural calculations and council fees are extra.

Guide prices for Bermondsey, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (21 m²)£51,500–£87,000
Typical project (30 m²)£73,500–£124,500
Larger project (42 m²)£103,000–£174,500
Rate per m²£2,450–£4,150

The biggest cost drivers are:

  • Party wall surveyor fees
  • Ground water and access
  • Waterproofing system
  • Existing cellar or new excavation

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a basement conversion in Bermondsey?

The approval route for Bermondsey is set by planning law in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

The work we manage on a basement conversion:

  • Party wall notices
  • Waterproofing design (tanking or cavity drain membrane)
  • Electrics, heating and plastering
  • Underpinning or new structure where needed
  • Lightwells and windows
  • Insulation, ventilation and drainage pumps

How long does it take?

The build itself usually takes 8 to 16 weeks for a cellar conversion; longer for new excavation. Allow time beforehand for drawings and approvals, usually 3 to 5 months.

Building in Bermondsey

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

From SE1 outwards, we take on projects throughout Bermondsey and the surrounding parts of Greater London.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about basement conversions in Bermondsey

How long does a basement conversion take in Bermondsey?

Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.

How do you keep a basement dry?

With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.

Does a basement conversion need planning permission?

Converting an existing cellar without changing the outside usually does not. New excavation, lightwells and changes visible from outside usually do.

Can a basement be a bedroom?

Yes, with a suitable escape route such as a lightwell window or protected stair.

How much does a basement conversion cost in Bermondsey?

In Bermondsey, a basement conversion typically costs £2,450–£4,150 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £73,500–£124,500. Your fixed price depends on the survey and drawings.

Tell us about your project in Bermondsey and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price