What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Canterbury?
In Canterbury, a basement conversion typically costs £2,150–£3,600 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £64,500–£108,000. The guide for Canterbury reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £45,000–£75,500 |
| Typical project (30 m²) | £64,500–£108,000 |
| Larger project (42 m²) | £90,500–£151,000 |
| Rate per m² | £2,150–£3,600 |
What moves the price most:
- Existing cellar or new excavation
- Ground water and access
- Lightwells
- Floor lowering and underpinning
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a basement conversion in Canterbury?
Before anything is built in Canterbury, we confirm which approvals apply in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Lightwells and windows
- Electrics, heating and plastering
- Waterproofing design (tanking or cavity drain membrane)
- Building control sign-off
- Insulation, ventilation and drainage pumps
- Structural and ground survey
How long does it take?
Allow 8 to 16 weeks for a cellar conversion; longer for new excavation. Before that, surveys, drawings and approvals usually take 3 to 5 months, longer if the council asks for changes.
Building in Canterbury
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Our Canterbury coverage includes postcode districts CT1, and we also work in nearby places such as Whitstable, Herne Bay and Faversham.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about basement conversions in Canterbury
Do I need party wall agreements?
In England and Wales, excavating near a neighbour’s foundations usually triggers the Party Wall etc. Act 1996.
How much does a basement conversion cost in Canterbury?
In Canterbury, a basement conversion typically costs £2,150–£3,600 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £64,500–£108,000. Your fixed price depends on the survey and drawings.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
How long does a basement conversion take in Canterbury?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.