What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Canterbury?
In Canterbury, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Canterbury. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,000–£10,500 |
| Higher specification | £10,500–£13,000 |
The main things that change the cost:
- Party wall involvement
- Flush or downstand beam
- Moving radiators, sockets and pipes
- Span of the opening
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Canterbury?
Approvals for a structural alteration in Canterbury follow the rules for England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most structural alterations:
- Fire protection to the steel
- Building control sign-off
- Making good, plastering and flooring repairs
- Steel beam supply and installation on padstones
- Temporary propping
- Building control application
How long does it take?
Expect 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Canterbury
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Our Canterbury coverage includes postcode districts CT1, and we also work in nearby places such as Whitstable, Herne Bay and Faversham.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about structural alterations in Canterbury
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.
How much does a structural alteration cost in Canterbury?
In Canterbury, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.
How long does a structural alteration take in Canterbury?
Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.