What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Dover?
In Dover, a basement conversion typically costs £2,150–£3,600 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £64,500–£108,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Dover. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £45,000–£75,500 |
| Typical project (30 m²) | £64,500–£108,000 |
| Larger project (42 m²) | £90,500–£151,000 |
| Rate per m² | £2,150–£3,600 |
What moves the price most:
- Floor lowering and underpinning
- Waterproofing system
- Party wall surveyor fees
- Existing cellar or new excavation
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a basement conversion in Dover?
Before anything is built in Dover, we confirm which approvals apply in England. In England converting an existing cellar with no external change usually does not need planning permission. New excavation, lightwells and changes to the front often do, and some councils, particularly in London, have specific basement policies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most basement conversions:
- Structural and ground survey
- Lightwells and windows
- Party wall notices
- Waterproofing design (tanking or cavity drain membrane)
- Building control sign-off
- Underpinning or new structure where needed
How long does it take?
Build time is typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals come first and typically take 3 to 5 months, depending on the approval route.
Building in Dover
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
If your home is in Dover or close by in Folkestone, Deal and Canterbury, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about basement conversions in Dover
Do I need party wall agreements?
In England and Wales, excavating near a neighbour’s foundations usually triggers the Party Wall etc. Act 1996.
Does a basement conversion need planning permission?
Converting an existing cellar without changing the outside usually does not. New excavation, lightwells and changes visible from outside usually do.
How much does a basement conversion cost in Dover?
In Dover, a basement conversion typically costs £2,150–£3,600 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £64,500–£108,000. Your fixed price depends on the survey and drawings.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
How long does a basement conversion take in Dover?
Typically 8 to 16 weeks for a cellar conversion; longer for new excavation. Design and approvals beforehand usually take 3 to 5 months.