What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Selby?
In Selby, a dormer loft conversion typically costs £44,500–£63,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). The guide for Selby reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £44,500–£63,000 |
| Higher specification | £63,000–£79,000 |
The main things that change the cost:
- Fire safety upgrades to the existing house
- Scaffolding and access
- Staircase position
- En-suite or bathroom
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a dormer loft conversion in Selby?
Before anything is built in Selby, we confirm which approvals apply in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most dormer loft conversions:
- Insulation, plastering, electrics and plumbing
- New staircase and fire-safe escape route
- Measured survey and head-height check
- Drawings and structural calculations
- Building control completion certificate
- Dormer structure, roof covering and windows
How long does it take?
Expect 6 to 9 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Selby
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Our Selby coverage includes postcode districts YO8, and we also work in nearby places such as Goole, Pontefract and York.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about dormer loft conversions in Selby
How much does a dormer loft conversion cost in Selby?
In Selby, a dormer loft conversion typically costs £44,500–£63,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Do I need a party wall agreement?
In England and Wales, if the conversion cuts into or builds on a shared wall, notices must be served under the Party Wall etc. Act 1996.
Who approves a dormer loft conversion in Selby?
Planning matters in Selby go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
