What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Aberystwyth?
In Aberystwyth, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £54,000–£83,000. Building costs in Wales run about 8% below the UK average, and the figures for Aberystwyth are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £37,500–£57,500 |
| Typical project (36 m²) | £54,000–£83,000 |
| Larger project (50 m²) | £75,000–£115,000 |
| Rate per m² | £1,500–£2,300 |
What moves the price most:
- Scaffolding and access to the rear
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
- Roof design and how it joins the existing roof
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Aberystwyth?
The approval route for Aberystwyth is set by planning law in Wales. In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most double-storey extensions:
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
- Opening up at both levels with steel beams
- Brick or block walls, floors and a roof tied into the house
- Electrics, heating, plumbing and plastering
- Design drawings and planning application
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Aberystwyth
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Projects in Aberystwyth (SY23) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Aberystwyth
Do I need planning permission for a double-storey extension in Aberystwyth?
In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
Do you build double-storey extensions in Aberystwyth?
Yes. We build double-storey extensions across Aberystwyth, including postcodes SY23. Every project starts with a free home visit.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How much does a double-storey extension cost in Aberystwyth?
In Aberystwyth, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £54,000–£83,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.