What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Aberystwyth?
In Aberystwyth, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £43,500–£68,500. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £31,000–£49,000 |
| Typical project (28 m²) | £43,500–£68,500 |
| Larger project (39 m²) | £60,500–£95,500 |
| Rate per m² | £1,550–£2,450 |
What moves the price most:
- Steel work where the side wall is opened
- Single or two storeys
- Roof design and tile matching
- Drains, gas meters or soil pipes that need moving
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Aberystwyth?
Whether you need planning permission depends on your house and its location in Wales. In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control completion
- Planning drawings and application
- Structural calculations
- Survey of the boundary, drains and access
- Electrics, heating and plastering
- Opening into the existing house
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Aberystwyth
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
If your home is in Aberystwyth or close by in Llandrindod Wells, Newtown and Carmarthen, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Aberystwyth
How much does a side extension cost in Aberystwyth?
In Aberystwyth, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £43,500–£68,500. Your fixed price depends on the survey and drawings.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Do I need planning permission for a side extension in Aberystwyth?
In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How long does a side extension take in Aberystwyth?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.