What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Aberystwyth?
In Aberystwyth, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£53,000. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£37,000 |
| Typical project (20 m²) | £36,000–£53,000 |
| Larger project (28 m²) | £50,500–£74,000 |
| Rate per m² | £1,800–£2,650 |
Your quote will depend mainly on:
- Ground conditions and foundation depth
- Glazing: sliding and bifold doors cost more than French doors
- Floor area and the length of new wall
- How much of the existing house is opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Aberystwyth?
Whether you need planning permission depends on your house and its location in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Foundations, drainage and any build-over agreement
- Doors, windows and roof glazing installed
- Building control inspections and completion certificate
- Measured survey and design drawings
- Knock-through to the existing house with steel beams
- Cavity walls, insulation and roof to current building regulations
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Aberystwyth
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Aberystwyth sits in Dyfed, about 40 miles north of Carmarthen. We cover the whole of Aberystwyth, including postcodes SY23.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Aberystwyth
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Do I need planning permission for a single-storey extension in Aberystwyth?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
How much does a single-storey extension cost in Aberystwyth?
In Aberystwyth, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£53,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Aberystwyth?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.