What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Orpington?
In Orpington, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £77,500–£117,000. The guide for Orpington reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £54,000–£81,000 |
| Typical project (36 m²) | £77,500–£117,000 |
| Larger project (50 m²) | £107,500–£162,500 |
| Rate per m² | £2,150–£3,250 |
The biggest cost drivers are:
- Scaffolding and access to the rear
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Brick matching and external finishes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Orpington?
The approval route for Orpington is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most double-storey extensions:
- Electrics, heating, plumbing and plastering
- Brick or block walls, floors and a roof tied into the house
- Structural engineer’s calculations
- Building control sign-off
- Windows, doors and staircase alterations
- Opening up at both levels with steel beams
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Orpington
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
If your home is in Orpington or close by in Sidcup, Swanley and Bromley, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Orpington
How much does a double-storey extension cost in Orpington?
In Orpington, a double-storey extension typically costs £2,150–£3,250 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £77,500–£117,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How long does a double-storey extension take in Orpington?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.