What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Orpington?
In Orpington, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £51,000–£75,000. Building costs in London run about 30% above the UK average, and the figures for Orpington are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £35,500–£52,500 |
| Typical project (20 m²) | £51,000–£75,000 |
| Larger project (28 m²) | £71,500–£105,000 |
| Rate per m² | £2,550–£3,750 |
Your quote will depend mainly on:
- Roof type and the size of any lantern or roof windows
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- How much of the existing house is opened up
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Orpington?
Before anything is built in Orpington, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Cavity walls, insulation and roof to current building regulations
- Foundations, drainage and any build-over agreement
- Building control inspections and completion certificate
- Measured survey and design drawings
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
How long does it take?
Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Orpington
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Projects in Orpington (BR6) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Orpington
Who approves a single-storey extension in Orpington?
Planning matters in Orpington go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Orpington?
In Orpington, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £51,000–£75,000. Your fixed price depends on the survey and drawings.
